Machine relocation
No printing machine or equipement is too big to be relocated. Also here globalisation requires flexible solutions. The relocation of a rotogravure printing machine with cutting press within Europe was one of the special tasks carried out by us. In addition to that the ventilation system had also to be optimized.
Within 5 weeks the machine was dismantled and transported to the new location. It was remounted, optimized and then put back into operation.